2/18/21 - PG&E POWER TIE-IN / INTERRUPTION SCHEDULED FOR FRIDAY 2/26/21 8AM-4PM

Power Connection Work - SCHEDULED FOR FRIDAY 2/26/21 8AM-4PM

The date for "energizing" the temp power lines for our site, which will cause a power interruption for the neighborhood, has been postponed due to PG&E scheduling/permit issues. We are still waiting for confirmation of all the details for this work from PG&E , but here is what we know as of today:

  • Date: 2/26/21
  • Duration: 8 hours maximum, hopefully less.
  • Time of day: 8am-4pm
  • Affected neighbors: Residences/businesses on the 1500 block of Park Ave and Halleck Streets.
  • Notice: PG&E mailed notices regarding this power interruption to residences/businesses on Tuesday 2/16/21.