OFFSITE WORK:

Power Connection Work:

We anticipate a power interruption when we connect our permanent power to the site; estimated September 13, 2021. We will continue to request clearer communication and more careful planning by PG&E for future planned outages that affect the neighborhood.

Joint Trench Undergrounding Work on Horton Street:

The Joint Trench (power and telecom utility trenching) work on Horton Street began on 6/14/21. Please be aware that extensive traffic controls will be in place during this work and it will take approximately 8 - 12 weeks to complete between 46th street and Park Avenue. There will be saw cutting, heavy machinery excavation work, increased truck traffic for soil off haul, etc. occurring during working hours, generally 7am - 6pm each day.

Sherwin Avenue Sidewalk / Landscape Construction:

Sidewalks are under active construction on the South side of Sherwin, please be aware of extra traffic controls in this area.

Landscape will begin on the Northside of Sherwin Ave this week.

45th & Hollis Intersection:

One of the improvements we are constructing as part of the development is a traffic signal at 45th and Hollis. That work is under way now and will take place in stages over a few months. Please look out for traffic controls in that area temporarily. We have worked with shuttle providers to temporarily relocate their pick up locations.

ON SITE WORK:

Building B1

- Stucco/plaster/ brick installation ongoing. Drywall installation ongoing inside the building.

Building B2

- Window installation is in progress. Mechanical trades are working inside the garage and the wood frame structures. Drywall installation inside the building is underway.

- Exterior stucco "scratch coat" starting this week.

Building D

- Wood framing is in progress. Fire Sprinkler and plumbing installation continuing.

Building C

- Wood Framing work is now in progress.

Have a safe week and we will be in touch with additional updates as the work progresses.